![]() ![]() ![]() Following privatisation of the UK rail network, the fleet was transferred to private operators for both freight and passenger operations.Ī total of 50 Class 90s were built by BREL Works in Crewe between 19 and were designed for a top operating speed of 110mph (180 km/h), operating from 25 kV AC overhead power and producing 5,000 bhp (3,700 kW). ![]() In the days of British Rail, many high speed services across the UK rail network were operated by Class 90 electric locomotives, often in ‘push-pull’ formations with a Driving Van Trailer (DVT) and full consist of coaches. ![]() A mainstay of BR’s locomotive fleet in the 1990s, the Class 90 was a replacement to BR’s ageing fleet of electric locomotives, and is now available for Train Simulator in two liveries that are ideal for the Great Eastern Main Line London-Ipswich route. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |